UPDATE TO RISK-INFORMED PRESSURIZED WATER REACTOR VESSEL 10 TO 20 YEAR INSPECTION INTERVAL EXTENSION

机译:10至20年检查间隔时间延长的风险管理型加压水反应堆容器的更新

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Pressurized Water Reactor Owners Group (formerly the Westinghouse Owners Group (WOG)) methodology for extending the inservice inspection interval for welds in pressurized water reactor (PWR) reactor pressure vessel (RPV) was introduced as ICONE12-49429. The paper presented a risk informed basis for extending the interval between inspections from the current interval of 10 years to 20 years. In the paper presented at ICONE-12, results of pilot studies on typical Westinghouse and Combustion Engineering Nuclear Steam Supply System (NSSS) designs of PWR vessels showed that the change in risk associated with the proposed inspection interval extension was within the guidelines specified in the United States Nuclear Regulatory Commission (NRC) Regulatory Guide 1.174 for an acceptably small change in risk. Since the methodology was originally presented, the evaluation has been updated to incorporate the latest changes in the NRC Pressurized Thermal Shock (PTS)rnRisk Reevaluation Program and expanded to include the Babcock and Wilcox NSSS RPV design. The results of these evaluations demonstrate that the proposed RPV inspection interval extension remains a viable option for the industry. The updates to the methodology and input, pilot plant evaluations, results, process for demonstrating applicability of the pilot plant analysis to non-pilot lead plants and lessons learned from the evaluations performed are summarized in this paper.
机译:压水堆所有者组(以前是西屋所有者组(WOG))用于扩展压水堆(PWR)反应堆压力容器(RPV)中焊缝的在役检查间隔的方法作为ICONE12-49429引入。该文件为将检查间隔从当前的10年延长到20年提供了风险依据。在ICONE-12上提交的论文中,对压水堆船舶的典型西屋和燃烧工程核蒸汽供应系统(NSSS)设计进行的试点研究结果表明,与建议的检查间隔期延长相关的风险变化在本指南中指定的准则之内。美国核监管委员会(NRC)监管指南1.174,规定风险的可接受的微小变化。自从最初提出方法以来,评估已更新,以纳入NRC加压热冲击(PTS)rnRisk重评估计划中的最新更改,并扩展到包括Babcock和Wilcox NSSS RPV设计。这些评估的结果表明,建议的RPV检查间隔延长仍然是该行业的可行选择。本文总结了方法和输入的更新,中试工厂评估,结果,演示中试工厂分析对非中试铅工厂的适用性的过程以及从进行的评估中学到的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号