PREPARATION AND EXECUTION OF THE GIS FIRST OVERHAUL FOR QINSHAN NPP PHASE ONE

机译:秦山核电厂一期GIS首次大修的准备与执行

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses the necessity and feasibility of the first major overhaul on the GIS based on the analysis of the special conditions and the issues we confronted ; After the comparison of various schemes, the optimized scheme is put forward; the paper also expounds the proper preparation and cautious practice which led to the hard but final accomplishment of the initial overhaul on the GIS; this article further explains the necessity of the major overhaul on the GIS through the disposal of abnormalities during the execution of this major overhaul.
机译:在分析特殊条件和我们面临的问题的基础上,提出了对GIS进行第一次大修的必要性和可行性;在对各种方案进行比较之后,提出了优化方案。论文还阐述了适当的准备和谨慎的实践,这些工作导致了对GIS的初步检查工作的艰巨而最终的完成。本文进一步说明了在进行大修期间通过处理异常情况对GIS进行大修的必要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号