Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

机译:布里斯班行人过道施工的顶进箱与切割和覆盖技术

获取原文
获取原文并翻译 | 示例

摘要

Evaluation of the construction method used for the pedestrian underpass construction at IpswichrnRoad, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructedrnthrough the existing railway embankment between Harrogate and O’Keefe Streets on the easternrnside of Ipswich Road. This underpass construction is part of the CLEM7 tunnel project (formerlyrnknown as the North-South Bypass Tunnel) which is the longest toll road in Australia at a total lengthrnof 6.8 km.rnThe jacked box construction technique was initially identifi ed as a preferred option during the tenderrnand concept design phases. However at the fi nal design stage, the cut and cover technique was selectedrnas this method can reduce the construction time and cost signifi cantly. The design and constructionrnteams effectively managed the challenges, complexities and risks associated with undertaking cut andrncover tunnel through the existing heavily utilised rail embankment. The on-site construction time forrnthe underpass using the cut and cover technique was reduced to less than 42 hours.
机译:本文介绍了澳大利亚布里斯班IpswichrnRoad的人行地下通道施工方法。行人地下通道是通过伊普斯威奇路东侧哈罗盖特街与奥基夫街之间的现有铁路路堤建造的。该地下通道建设是CLEM7隧道项目(以前称为南北绕行隧道)的一部分,该隧道是澳大利亚最长的收费公路,全长6.8公里。rn最初,在运输过程中,人们认为顶置箱施工技术是首选方案。投标概念设计阶段。然而,在最终设计阶段,选择了遮盖和覆盖技术,这种方法可以显着减少施工时间和成本。设计和施工团队通过现有的高利用率铁路路堤有效地应对了与开挖和掩埋隧道相关的挑战,复杂性和风险。使用切口覆盖技术的地下通道现场施工时间减少到不到42小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号