Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

机译:隧道掘进机无法操作的钢制沉管隧道–墨尔本主要下水道更换项目的Yarra河穿越工程

获取原文
获取原文并翻译 | 示例

摘要

The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involvingrnapproximately 2.3 km of tunnelling and construction works. The works extend from DocklandsrnPrecinct, on the southwest edge of the city, southwards to connect with the Hobsons Bay Main Sewerrnin Port Melbourne. The tunnel boring machine (TBM) tunnelled section of the works terminates at thernYarra River where the delta geology and alignment requirements precluded the use of undergroundrntunnelling methods. The 132 m long river crossing works involve a cut-and-cover excavation withinrna staged fl ooded cofferdam construction to construct an immersed tube tunnel as an extension of thernTBM works.rnThis paper reports on the development of the staged construction method and highlights therngeotechnical and structural design aspects involved in building a new sewer in the Yarra River tornclose the gap between the new TBM driven and pipe-jacked tunnels.
机译:墨尔本主要下水道更换(MMSR)是一项重大的城市基础设施项目,涉及约2.3公里的隧道和建筑工程。这些工程从城市西南边缘的Docklandsrn Precinct向南延伸,以与Hobsons Bay Main Sewerrnin Port Melbourne连接。该工程的隧道掘进机隧道掘进段终止于雅拉河,那里的三角洲地质和路线要求禁止使用地下掘进方法。 132 m长的跨河工程包括在分段溢流式围堰内的明挖开挖施工,以建造沉管隧道作为ThernTBM工程的延伸。本文对分段施工方法的发展进行了报道,并重点介绍了岩土工程技术和结构在亚拉河(Yarra River)修建新的下水道的设计方面,拉开了新的TBM隧道和顶管隧道之间的距离。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号