THE MID NIIGATA EARTHQUAKE AND ASEISMIC DESIGN OFKASHIWAZAKI-KARIWA NUCLEAR POWER STATION

机译:川崎-ARI羽核电站新泻中部地震与抗震设计

获取原文
获取原文并翻译 | 示例

摘要

The magnitude 6.8 Mid Niigata Earthquakern(MNE) on October 23, 2004, centered in the ChuetsurnRegion of Niigata Prefecture at a depth of 13km,rnproduced peak ground acceleration of about 1,722Galrnin Kawaguchi Town, Niigata. This earthquake, arntypical result of near-fault strong motion, causedrnhouses to collapse and landslides to occur, mostly inrnand around Kawaguchi town and Ojiya City, andrncaused 40 deaths. Additionally, a characteristic of thisrnearthquake is that major aftershocks continued forrnmore than two weeks afterward.rnThe Kashiwazaki-Kariwa Nuclear PowerrnStation (KKS) of Tokyo Electric Power Companyrn(TEPCO) is located about 28km northwest from thernepicenter of this earthquake. During the mainrnearthquake, response acceleration of about 54Gal wasrnrecorded on the base mat of the reactor building,rnwhile the SCRAM acceleration is 120Gal. Under thernmain earthquake and aftershocks, the facilitiesrnmaintained plenty of structural integrity. The sixrnreactor units continued to operate during the mainrnearthquake (No.4 unit was under a periodicrninspection), but during one of aftershocks the turbinernprotection interlock activated in No.7 unit, causingrnthe unit to shut down (the unit restarted soon after).rnThe main reasons being that magnitude of 6.9rnearthquake, larger and nearer than the MNE, isrnconsidered as design basis earthquake for KKS, inrnaddition, nuclear power plants should be constructedrnon a bedrock without remarkable amplification ofrnearthquake motion, based on the aseismic designrncriteria.Generally, Japanese reactor buildings andrnfacilities are designed with significant safety marginsrnin the event of an earthquake. During this event, nonernof this safety was compromised, and performancernagainst an earthquake of a nuclear power plant wasrnshown sufficiently.rnHowever, on the basis of essences of thisrnearthquake, a detailed survey was carried outrnincluding influence of the aftershocks and suitabilityrnof design basis earthquake settings.
机译:2004年10月23日,新泻中部6.8级地震(MNE)以新泻县的Chuetsurn地区为中心,深度为13 km,产生了约1,722加仑新泻河口町的峰​​值地面加速度。这次地震是近断层强烈运动的典型结果,导致房屋倒塌并发生山体滑坡,其中大部分倒塌在川口町和大谷屋市周围,造成40人死亡。此外,这次地震的一个特点是,大余震持续了两个多星期。东京电力公司(TEPCO)的柏崎aki里核电站(KKS)位于地震中心附近约28公里处。在主震期间,反应堆建筑物基垫上记录了约54Gal的响应加速度,而SCRAM加速度为120Gal。在大地震和余震的作用下,这些设施保持了足够的结构完整性。六个反应器单元在大地震期间继续运行(4号单元受到定期检查),但在余震中,涡轮保护联锁在7号单元中激活,导致该单元关闭(该单元不久后重新启动)。原因是,比起MNE更大和更接近的6.9级地震,被认为是KKS的设计基础地震,此外,应根据抗震设计标准在基岩上建造不会显着放大地震运动的核电厂。通常,日本的反应堆建筑物地震发生时,设施的设计具有很大的安全余量。在此事件中,这种安全性受到严重损害,并且充分展现了核电站地震的性能。然而,根据此次地震的实质,进行了详细的调查,包括余震的影响和适用性设计基准地震设置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号