The evaluation of overvoltage during short-time additional earthing of healthy phase for fault location in MV networks

机译:MV网络中故障位置的健康阶段短时附加接地期间的过电压评估

获取原文
获取原文并翻译 | 示例

摘要

The paper is focused on the operational experience with an automatic system for additional earthing of the faulty or healthy phase during an earth fault. The system is primarily used for limiting of a fault current in the point of the fault by earthing of the faulty phase during an earth fault. The equipment for additional earthing of faulty phase can also be used for short-time connection of healthy phase to earth fault location. There are fast circuit breakers for additional earthing in the substation and the cycle close-open is shorter then time for tripping of overcurrent protection in the outgoing feeder-bay (100 ms). This method of fault location in MV network could bring additional overvoltage which stresses the insulation of MV networks elements, similar as described in [7], [8] and [9]. This paper presents the simulation and experimental verification of this phenomenon and gives the recommendation for choosing the healthy phase for minimizing the negative influence of this location technique.
机译:本文着重于自动系统的操作经验,该系统用于在接地故障期间将故障或正常运行阶段进行额外接地。该系统主要用于在接地故障期间通过将故障相接地来限制故障点的故障电流。故障相的额外接地设备也可用于将健康相短时连接到接地故障位置。变电站中有一些快速断路器可用于额外接地,并且闭合循环的时间要短,然后要断开输出馈线柜中过电流保护的时间(100毫秒)。 MV网络中的故障定位方法可能会带来额外的过电压,这会增加MV网络元件的绝缘,类似于[7],[8]和[9]中所述。本文介绍了这种现象的仿真和实验验证,并提出了选择健康阶段的建议,以最大程度地减少这种定位技术的负面影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号