...
首页> 外文期刊>Foster Natural Gas Report >NORTHERN NATURAL GAS FILES LATEST PHASE OF NORTHERN LIGHTS PROJECT - THE 2009-2010 ZONE EF EXPANSION - AND SEEKS ROLLED-IN PRICING BASED ON ANALYSIS OF NORTHERN LIGHTS AS A WHOLE
【24h】

NORTHERN NATURAL GAS FILES LATEST PHASE OF NORTHERN LIGHTS PROJECT - THE 2009-2010 ZONE EF EXPANSION - AND SEEKS ROLLED-IN PRICING BASED ON ANALYSIS OF NORTHERN LIGHTS AS A WHOLE

机译:基于整个北极光的分析,北部天然气项目是北极光项目的最新阶段-2009-2010年区域EF扩张,价格波动的趋势

获取原文
获取原文并翻译 | 示例
           

摘要

On October 17,Northern Natural Gas Co. (CP09-11) filed an application for its 2009-2010 Zone EF Expansion,part of a multi-phase Northern Lights project to expand Market Area capacity at least every two years through 2026 in response to future growth requirements. The facilities are needed to satisfy long-term contracts underlying Northern Lights and requests for firm capacity in the Zone EF Open Season held in October and November 2007,which yielded no offers to turn back capacity. Northern proposed to abandon,remove,and replace various pipeline facilities and add a 14,000 horsepower (hp) Albert Lea greenfield mainline compressor station in Freeborn County,as well as a new Corcoran town border station (TBS) in Hennepin County - all in Minnesota. The project would affect seven counties (Carver,Wright,Hennepin,Dakota,Anoka,Washington,and Freeborn). The estimated cost is 120.5 million.
机译:10月17日,Northern Natural Gas Co.(CP09-11)申请了其2009-2010年EF区扩展计划,该计划是多阶段Northern Lights项目的一部分,该计划旨在至少每两年至2026年扩大市场容量,以应对未来的增长需求。需要这些设施来满足北极光的长期合同,并要求在2007年10月和11月举行的EF区域开放季节中获得稳定的生产能力,但没有提供退还生产能力的报价。北方公司提议放弃,拆除和更换各种管道设施,并在弗里伯恩县增加一个14,000马力的马力·李绿地干线压缩机站,并在亨尼平县新建一个科科伦镇边境站(TBS)-全部位于明尼苏达州。该项目将影响七个县(卡弗,莱特,亨内平,达科他州,阿诺卡,华盛顿和弗里伯恩)。估计费用为1.205亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号