首页> 外文期刊>Engineering Geology >The repeated failure of a cut-slope despite continuous reassessment and remedial works
【24h】

The repeated failure of a cut-slope despite continuous reassessment and remedial works

机译:尽管进行了不断的重新评估和补救工作,但边坡屡次失败

获取原文
获取原文并翻译 | 示例
           

摘要

The failure of slopes and the subsequent costs of remedial works are often the result of insufficient geological investigation and inadequate interpretation of ground conditions prior to design. This is compounded by poor investigations into the causes of failures and systemic problems associated with poorly defined responsibilities for the stability of cut-slopes. This paper reviews such problems in detail with reference to the repeated failure of one large slope in Korea. It is demonstrated that the original ground investigation and design were deficient particularly considering the predictable complexity of the geological conditions. Subsequent investigations were similarly deficient. As a consequence the slope failed six times despite nine reassessments by various professional engineers and the implementation of several different remedial schemes over a period of 7 years up to a disastrous failure in 2002. Further reviews, redesign, construction and litigation have continued since then up to the present. During the history of design, failure and reassessment the height of the cut-slope increased from 45 m to 155 m and the cost increased from 3.3 million to 26 million US dollars.
机译:边坡的失败和随后的补救工作费用通常是由于地质调查不足和设计前对地面状况的解释不足所致。对失败原因和系统问题的调查不足,与对边坡稳定性的责任不明确相关,这使情况更加复杂。本文针对韩国一个大斜坡的反复破坏,对这些问题进行了详细的回顾。结果表明,特别是考虑到地质条件的可预测复杂性,原始的地面调查和设计是有缺陷的。随后的调查也同样不足。结果,尽管各种专业工程师进行了九次重新评估,并在7年内实施了几种不同的补救方案,但直到2002年灾难性的失败,该斜坡仍发生了六次失败。自那时起,继续进行进一步的审查,重新设计,施工和诉讼。到现在。在设计,失败和重新评估的历史过程中,挖坡的高度从45 m增加到155 m,成本从330万美元增加到2600万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号