Study on the application of double corridor project in managing geological defects affecting transmission lines in mining areas

机译:双走廊项目在矿区输电线路管理地质缺陷中的应用研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The iron tower of transmission lines and its foundation are often confronted with settlement, inclination, displacement, distortion, etc. caused by surface movement and deformation. The double corridor project takes advantage of the layout of working surface, basically the regular time and the slowness of surface movement and deformation. Combined with geological information and mining conditions, the project chooses to construct new corridors in stable goafs which have been moved and deformed by coal mining. Through detecting tower deformation and mastering its trend, the new corridor will be built as soon as the deformation degree reaches the early warning value (the deflection of tangent tower reaches 0.3% while that of angle tower reaches 0.7%). The old corridor is then transformed into a double-corridor project. This project provides new ideas for transmission lines construction in mining areas by solving the problems in rerouting and high cost.
机译:传输线的铁塔及其基础往往面对由表面运动和变形引起的沉降,倾斜,位移,失真等。 双走廊项目利用工作面的布局,基本上是常规时间和表面运动和变形的衰退。 结合地质信息和采矿条件,该项目选择在稳定的利用岩层中建造新走廊,这些走廊被煤矿煤炭移动和变形。 通过检测塔变形并掌握其趋势,一旦变形程度达到预警值,就会建造新走廊(切线塔的偏转达到0.3%,而角塔的角度塔达到0.7%)。 然后将旧走廊转换为双走廊项目。 该项目通过解决REROUTING和高成本中的问题,为采矿区传输线路建设提供了新的思路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号