...
首页> 外文期刊>PACE: Process & Control Engineering >Western Australian mines power forward with hybrid energy projects
【24h】

Western Australian mines power forward with hybrid energy projects

机译:西澳澳大利亚矿业促进杂交能源项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Two Western Australian mines are switching to wind, solar and battery power as a way of improving reliability with lower emissions at a lower cost. Gold Fields' Agnew gold mine is already constructing a wind, solar, battery and gas hybrid facility at their site 1, 000 kilometres north east of Perth, which has received $13.5 million in funding from ARENA.
机译:两家西部澳大利亚地雷正在切换到风,太阳能电池电源,以提高可靠性,以较低的成本降低排放量。 黄金田地'Agnew Gold Mine已经在珀斯东部1,000公里的地方建造了风,太阳能电池和燃气机械设施,从竞技场获得了1350万美元的资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号