...
首页> 外文期刊>Journal of irrigation engineering and rural planning >The irrigation engineering center project in Thailand (Phase II)
【24h】

The irrigation engineering center project in Thailand (Phase II)

机译:泰国的灌溉工程中心项目(第二阶段)

获取原文
获取原文并翻译 | 示例
           

摘要

In February 1982, the Government of Thailand requested Japanese assistance for the Royal Irrigation Department (RID) for the construction of an Irrigation Engineering Center (IEC) building, provision of equipment, and project-type technical cooperation. The Government of Japan donated grant assistance of I, 770 million yen in order to construct two buildings at Samsen and Pakret with machinery and equipment necessary for technical cooperation under the Exchange of Note (E/N) dated June 27, 1983. After completion, the facilities were handed over to RID in March 1985. The Japan International Cooperation Agency (JICA) dispatched an Implementation Survey Team in March 1985 to sign the Record of Discussion on mutual discussion, understanding and cooperation among the authorities of both parties. The technical cooperation activities of the IEC (Phase I) were implemented in accordance with the Record of Discussion for five years after April 1985.
机译:1982年2月,泰国政府请求日本向皇家灌溉署(RID)提供援助,以建造灌溉工程中心(IEC)大楼,提供设备并进行项目类型的技术合作。日本政府捐赠了7.7亿日元的I赠款,目的是在1983年6月27日通过交换纸币(E / N)在Samsen和Pakret建造两栋具有技术合作所需的机器和设备。完工后,设施于1985年3月移交给了RID。日本国际协力机构(JICA)于1985年3月派出了一个执行情况调查小组,以签署有关双方当局之间相互讨论,理解与合作的讨论记录。 IEC的技术合作活动(第一阶段)是根据1985年4月以后的讨论记录进行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号