Interbasin water transfer in Totsukawa River and Kinokawa River Integrated Development Project

机译:户川川与木川川综合开发项目跨流域调水

获取原文
获取原文并翻译 | 示例
           

摘要

The Totsukawa River and Kinokawa River Integrated Development Project (TKDP) was one of the national projects planned for reconstruction of Japan's war-torn economy just after the Second World War. The target area of TKDP was spread over Nara and Wakayama Prefectures, the Middle West of Japan (see Figure 1). The project was undertaken for the following objectives: (a) Irrigation water supply for a 21,000 ha of agricultural land in Nara and Wakayama Prefectures; (b) Domestic water supply for 400,000citizens in Nara Prefecture; (c) Water supply for industrial use in Wakayama Prefecture; and (d) Generation of electricity. The following construction works were implemented in the project, which was begun in 1952 and completed in 1984 (see Figure 2): (a) Construction of a diversion dam (Yoshinogawa Bunsui) at Shimobuchi, the midstream of the Kinokawa River, to bring water to the Nara Basin for irrigation and drinking; (b) Construction of irrigation canal networks for delivering water from the KinokawaRiver to agricultural land in the Nara Basin; (c) Reorganization of a number of existing primitive weirs into four new barrages in the downstream area of the Kinokawa River in order to improve the irrigation systems in the Wakayama Plain; (d) Construction of Nishiyoshino Barrage and its irrigation canals for agricultural development of the higher land surrounding the Wakayama Plain; (e) Construction of Osako Dam and Tsuburo Dam for controlling stream flow of the Kinokawa River; (f) Construction of Sarutani Dam at the upstream area of the Totsukawa River as the source for water transfer (Totsukawa Bunsui) from the Totsukawa River to the Kinokawa River, compensating for the diversion of water from the Kinokawa to the Nara Basin; and (g) Hydropower generation at Osako Dam and Sarutani Dam. The details of these facilities are shown in Table 1.
机译:二次世界大战刚过后,土川河和木川川河综合开发项目(TKDP)是为日本受战争破坏的经济重建而计划的国家项目之一。 TKDP的目标区域遍布日本中西部的奈良和和歌山县(见图1)。进行该项目的目的是:(a)奈良和和歌山县21,000公顷农业用地的灌溉水供应; (b)奈良县40万市民的生活用水; (c)和歌山县的工业用水; (d)发电。该项目于1952年开始并于1984年完成(图2),实施了以下建设工程:(a)在奇诺川河中游下渊的引水坝(吉野川文水)建设到奈良盆地灌溉和饮用; (b)建设灌溉渠网,将水从奇诺川河运到奈良盆地的农田; (c)在奇诺川河下游地区将一些现有的堰堰重组为四个新的堰坝,以改善和歌山平原的灌溉系统; (d)在和歌山平原周边较高土地上建设西吉野堰坝及其灌溉渠,以发展农业; (e)修建大沙坝和椿浦水坝,以控制木川河的水流; (f)在鸟川川上游地区修建萨鲁塔尼大坝,作为从鸟川川到奇诺川河的调水源(鸟川文水),以补偿水从奇川川到奈良盆地的转移; (g)Osako大坝和Sarutani大坝的水力发电。这些设施的详细信息如表1所示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号