【24h】

Estimation of rock stress around cavern by CCBO and AE method

机译:CCBO和AE法估算洞室围岩应力

获取原文
获取原文并翻译 | 示例

摘要

For the purpose of evaluation of the excavation disturbed zone and the examination of the stability of the cavern during excavation of the cavern, authors performed stress measurement and AE monitoring of rock around the cavern. The applied stress measuring technique is the CCBO method. For the purpose of setting up the judgment index of rock condition, the laboratory test using the rock core was carried out before the on-site AE monitoring. In this paper, authors describe the process of stress change and the feature of EDZ during excavation of cavern.
机译:为了评估开挖扰动区和检查洞穴开挖过程中洞穴的稳定性,作者对洞穴周围的岩石进行了应力测量和声发射监测。应用的应力测量技术是CCBO方法。为了建立岩石状况的判断指标,在现场AE监测之前进行了使用岩心的实验室测试。在本文中,作者描述了洞室开挖过程中的应力变化过程和EDZ的特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号