...
首页> 外文期刊>International Journal of Rock Mechanics and Mining Sciences >ISRM Suggested Methods of rock stress estimation -- Part 4: Quality control of rock stress estimation
【24h】

ISRM Suggested Methods of rock stress estimation -- Part 4: Quality control of rock stress estimation

机译:ISRM建议的岩石应力估算方法-第4部分:岩石应力估算的质量控制

获取原文
获取原文并翻译 | 示例
           

摘要

1. This is Part 4 of four new ISRM-suggested methods (SMs) for rock stress estimation: Part 1: Strategy for rock stress estimation. Part 2: Overcoring methods. Part 3: Hydraulic fracturing and/or hydraulic testing of pre-existing fractures (HTPF) methods. Part 4: Quality control of rock stress estimation. These SMs are published together in a Rock Stress Estimation Special Issue of the International Journal of Rock Mechanics and Mining Sciences, 2003, Vol. 40, Issue 7-8, together with a suite of supporting contributions describing various aspects of rock stress estimation. It is strongly recommended that the new SMs be studied in association with the supporting contributions in the 2003 Special Issue-because these contributions provide a wealth of further detail and measurement case examples. 2. The Client requires information on the rock stress to be traceable, with an accuracy in conformity with his/ her specification. This can only be achieved if an adequate quality control system is in place and operated successfully throughout the duration of the work, from original conception to presentation of the results. Accordingly, this Part 4 SM provides guidance on the key issues related to implementing an adequate Quality Control system. Following an overview table of the Technical Auditing issues for stress measurements, a series of detailed tables is presented covering 26 issues under the 10 audit Subject Areas of stress measurement objective and background, stress measurement method, contractual aspects, establishing Quality Assurance procedures, quality aspects for establishing the viability of stress measurements at a given location/depth, measurement procedures, stress data reduction and interpretation, continuous evaluation process, validation and presentation, and Technical Auditing conclusions.
机译:1.这是岩石应力估计的四种新的ISRM建议方法(SM)的第4部分:第1部分:岩石应力估计的策略。第2部分:覆盖方法。第3部分:已有裂缝的水力压裂和/或水力测试(HTPF)方法。第4部分:岩石应力估算的质量控制。这些SM一起发表在《国际岩石力学与采矿科学杂志》(2003年,第1期)的“岩石应力估计”特刊中。 40,第7-8期,以及描述岩石应力估算各个方面的一整套支持性贡献。强烈建议结合2003年《特刊》中的辅助文稿来研究新的SM,因为这些文稿提供了大量的详细信息和度量案例。 2.客户要求有关岩石应力的信息可追溯,并符合其规格。只有在建立适当的质量控制体系并在整个工作过程中成功运行(从最初的构思到结果的展示),才能实现这一目标。因此,该第4部分SM提供了与实施适当的质量控制体系有关的关键问题的指南。紧随压力测量技术审核问题的概览表之后,在压力测量目标和背景,压力测量方法,合同方面,建立质量保证程序,质量方面的10个审计主题领域中,列出了一系列详细表,涵盖了26个问题用于确定给定位置/深度的应力测量的可行性,测量程序,应力数据的减少和解释,连续评估过程,验证和表示以及技术审核结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号