首页> 外文会议>International Conference on Electric Technology and Civil Engineering >Optimization for project selection and scheduling problems considering time-dependent resource constraints
【24h】

Optimization for project selection and scheduling problems considering time-dependent resource constraints

机译:考虑时间依赖性资源约束的项目选择和调度问题优化

获取原文

摘要

This study presents an optimization model using constraint programming (CP) for project selection and scheduling problems with time-dependent resource constraints. The proposed model aims to maximize total profit from selected projects, while scheduling the projects with various resource constraints with specified time intervals, including consumed and renewable resources. The optimization model integrates the project selection mechanism, relationship among projects, budget limit, and assignment of renewable resources. Due to procurement strategies and various annual budget concerns, this research considers various constraints for scheduling and resource allocation problems, such as resource constraint and budget limit. The current study presents a scenario as the basis for selecting fifteen candidate projects with different constraints to illustrate model capability. The analysis result demonstrates that the proposed model allows planners to determine an optimal portfolio of project selection with resource constraints according to various time intervals.
机译:本研究介绍了使用约束编程(CP)的优化模型,用于项目选择和调度问题与时间相关的资源约束。拟议的模型旨在最大限度地从所选项目中最大限度地利润,同时调度具有指定时间间隔的各种资源限制的项目,包括消耗和可再生资源。优化模型集成了项目选择机制,项目之间的关系,预算限制和可再生资源的分配。由于采购策略和各个年度预算问题,本研究考虑了调度和资源分配问题的各种限制,例如资源限制和预算限制。目前的研究呈现了一种方案,作为选择具有不同约束的十五候选项目的基础,以说明模型能力。分析结果表明,所提出的模型允许规划者根据各种时间间隔确定具有资源约束的项目选择的最佳项目选择组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号