...
首页> 外文期刊>International Journal of Industrial Engineering & Production Research >A Simulation Optimization Approach for The Multi-Objective Multi-Mode Resource Constraint Project Scheduling Problem
【24h】

A Simulation Optimization Approach for The Multi-Objective Multi-Mode Resource Constraint Project Scheduling Problem

机译:多目标多模式资源约束项目调度问题的仿真优化方法

获取原文
           

摘要

According to the real projects' data, activity durations are affected by numerous parameters. In this research, we have developed a multi-resource multi objective multi-mode resource constrained scheduling problem with stochastic durations where the mean and the standard deviation of activity durations are related to the mode in which each activity is performed. The objective functions of model were to minimize the net present value and makespan of the project. A simulation-based optimization approach was used to handle the problem with several stochastic events. This feature helped us to find several solutions quickly while there was no need to take simplification assumptions. To test the efficiency of the proposed algorithm, several test problems were taken from the PSPLIB directory and solved. The results show the efficiency of the proposed algorithm both in quality of the solutions and the speed.
机译:根据真实的项目数据,活动持续时间受到许多参数的影响。在本研究中,我们开发了一种多资源多目标多模式资源约束调度问题,随机持续时间是活动持续时间的平均值和标准偏差与执行每个活动的模式相关。模型的客观函数是最大限度地减少项目的净目前值和Mapspan。使用仿真的优化方法来处理多个随机事件的问题。此功能帮助我们快速找到了多种解决方案,而无需进行简化假设。为了测试所提出的算法的效率,从PSPLIB目录中取出了几个测试问题并解决了。结果表明了解决方案质量和速度的提出算法的效率。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号