Optimization for project selection and scheduling problems considering time-dependent resource constraints

机译:考虑时间依赖性资源约束的项目选择和进度安排问题的优化

获取原文

摘要

This study presents an optimization model using constraint programming (CP) for project selection and scheduling problems with time-dependent resource constraints. The proposed model aims to maximize total profit from selected projects, while scheduling the projects with various resource constraints with specified time intervals, including consumed and renewable resources. The optimization model integrates the project selection mechanism, relationship among projects, budget limit, and assignment of renewable resources. Due to procurement strategies and various annual budget concerns, this research considers various constraints for scheduling and resource allocation problems, such as resource constraint and budget limit. The current study presents a scenario as the basis for selecting fifteen candidate projects with different constraints to illustrate model capability. The analysis result demonstrates that the proposed model allows planners to determine an optimal portfolio of project selection with resource constraints according to various time intervals.
机译:这项研究提出了一种使用约束规划(CP)的优化模型,用于具有时间依赖性资源约束的项目选择和调度问题。提出的模型旨在最大化选定项目的总利润,同时以指定的时间间隔(包括已消耗和可再生资源)安排具有各种资源约束的项目。优化模型集成了项目选择机制,项目之间的关系,预算限制和可再生资源的分配。由于采购策略和各种年度预算问题,本研究考虑了调度和资源分配问题的各种约束,例如资源约束和预算限制。当前的研究提出了一个方案,以作为选择具有不同约束条件的15个候选项目的基础,以说明模型的功能。分析结果表明,所提出的模型使规划人员可以根据不同的时间间隔,确定具有资源约束的项目选择的最优组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号