首页> 外文会议>International Conference on Advanced Electronic Materials, Computers and Materials Engineering >Research on The Influence of Rope Jumping on The Tension of Multi-layer Winding Wire Ropes in Super Deep Mine Hoisting Machine
【24h】

Research on The Influence of Rope Jumping on The Tension of Multi-layer Winding Wire Ropes in Super Deep Mine Hoisting Machine

机译:超深型矿井吊装机中多层绕组绳绳跳跃对绳索张力的影响研究

获取原文

摘要

Aimed at the process of rope arrangement in double-rope winding drum of super-deep mine hoist, the tension change during rope jumping fault is studied. By analyzing the relationship between the length difference of two ropes caused by rope jumping and tension, the tension simulation model of multi-layer winding drum rope jumping is established in MATLAB, and the results of simulation and experiment are analyzed and compared. The results show that the rope jumping fault will lead to the tension change of the two ropes, and under different rope jumping faults, the tension change law of the rope is different. The simulation model can well reflect the relationship between rope jumping and tension change, and can quantitatively simulate the tension change during rope jumping. These results have important reference value for fault diagnosis research of hoisting system jump in ultra-deep mine.
机译:针对超深矿葫芦双绳绕组鼓中的绳索布置的过程,研究了绳索跳跃故障期间的张力变化。通过分析绳索跳跃和张力引起的两个绳索长度差之间的关系,在MATLAB中建立了多层绕组鼓绳跳跃的张力仿真模型,分析了仿真和实验的结果。结果表明,绳索跳跃过错会导致两轮绳索的张力变化,在不同的绳索跳跃故障下,绳子的张力变化规律是不同的。仿真模型可以很好地反映绳索跳跃和张力变化之间的关系,并且可以定量模拟绳索跳跃过程中的张力变化。这些结果对超深矿井跳跃系统跳跃的故障诊断研究具有重要的参考价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号