首页> 外文会议>International Petroleum Technology Conference >Samarang Field - Seismic To Simulation Redevelopment Evaluation Brings New Life to an Old Oilfield, Offshore Sabah, Malaysia
【24h】

Samarang Field - Seismic To Simulation Redevelopment Evaluation Brings New Life to an Old Oilfield, Offshore Sabah, Malaysia

机译:Samarang Field - 模拟重建评估的地震带来了新的生命,为马来西亚近岸沙巴为旧油田

获取原文

摘要

Samarang field is a 35 year-old oilfield offshore Malaysia that was initially developed by Shell beginning in 1975. The field was relinquished to Petronas Carigali Sdn Bhd (PCSB) in 1995, which continued field operations and were able to significantly reduce the production decline rates. PCSB also transformed the field into a producing hub, allowing development of two small adjacent fields by reducing the required capital costs. However by 2003, the field was in trouble with production declining and reserves dwindling, suggesting field abandonment was on the horizon. Beginning in 2004, PCSB outsourced a major redevelopment evaluation to a multi-disciplinary, international consulting team. They maintained control by using internal expertise to peer review and assist the team's progress throughout the evaluation and at key milestone meetings. This process allowed PCSB to leverage their own organization's skills while using new technology tools employed by the team. The evaluation included a complete review of all static data, literally a seismic to simulation study approach, employing virtually every subsurface discipline in an attempt to unlock the field's remaining value. The results were full-field static and dynamic models covering the entire field and allowing an integrated redevelopment plan. This plan consists of numerous infill producers and selective application of enhanced oil recovery. In addition, several near-field exploratory targets were identified. Field redevelopment is currently being implemented in a phased approach including 1) ongoing production enhancement, 2) sidetracking of idle wells to updip positions, 3) addition of new well jackets for additional development wells, and 4) selective injection into the larger reservoirs with relatively lower primary recovery. The evaluation will provide dividends for years to come with expected doubling of current production and extension of field life for another 15 years.
机译:Samarang Field是一个35岁的油田离岸马来西亚,最初是由壳牌开始于1975年开发的。该领域于1995年将该领域放弃了Petronas Carigali Sdn Bhd(PCSB),该领域持续的现场业务并能够显着降低生产衰退率。 PCSB还将现场转换为生产集线器,通过降低所需的资本成本,允许开发两个小相邻领域。然而,到2003年,该领域陷入了困难的生产下降和储备陷入困境,暗示野外遗弃在地平线上。从2004年开始,PCSB将重建的重建评估外包给多学科,国际咨询团队。他们通过使用内部专业知识来控制对同行审查并协助团队在整个评估和主要里程碑会议上进行控制。此过程允许PCSB在使用团队使用的新技术工具时利用自己的组织的技能来利用自己的组织的技能。该评估包括对所有静态数据的完整审查,从字面上是模拟研究方法的地震,几乎所有地下纪律都在尝试解锁该领域的剩余价值。结果是覆盖整个场的全场静态和动态模型,并允许集成的重建计划。该计划包括众多填充生产商,并选择性地应用增强的采油。此外,还确定了几种近场探索目标。现场重建目​​前正在以分阶段的方法实施,包括1)持续的生产增强,2)闲置井的闲置井,3)添加新的井套进行额外的开发井,4)选择性地注入较大的水库中的较大水库较低的主要恢复。评估将提供股息多年,该股份需要预期的目前生产和延长现场生活的倍增15年。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号