...
首页> 外文期刊>Northeastern Naturalist >Influences of High-flow Events on a Stream Channel Altered by Construction of a Highway Bridge: A Case Study
【24h】

Influences of High-flow Events on a Stream Channel Altered by Construction of a Highway Bridge: A Case Study

机译:高流量事件对公路桥梁施工改变河道的影响:案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Impacts of highway construction on streams in the central Appalachians are a growing concern as new roads are created to promote tourism and economic development in the area. Alterations to the streambed of a first-order stream, Sauerkraut Run, Hardy County, WV, during construction of a highway overpass included placement and removal of a temporary culvert, straightening and regrading of a section of stream channel, and armourment of a bank with a reinforced gravel berm. We surveyed longitudinal profiles and cross sections in a reference reach and the altered reach of Sauerkraut Run from 2003 through 2007 to measure physical changes in the streambed. During the four-year period, three high-flow events changed the streambed downstream of construction including channel widening and aggradation and then degradation of the streambed. Upstream of construction, at a reinforced gravel berm, bank erosion was documented. The reference section remained relatively unchanged. Knowledge gained by documenting channel changes in response to natural and anthropogenic variables can be useful for managers and engineers involved in highway construction projects.
机译:公路建设对阿巴拉契亚中部河流的影响日益引起人们的关注,因为新建了道路以促进该地区的旅游业和经济发展。在建设高速公路立交桥期间,对一级流的水流(西弗吉尼亚州哈迪县的Sauerkraut Run)进行了改动,包括放置和拆除临时涵洞,对部分河道进行校直和改质,以及用加强的砾石护堤。我们测量了参考河段的纵剖面和横截面以及2003年至2007年Sauerkraut Run的变化河段,以测量河床的物理变化。在四年期间,三个高流量事件改变了施工下游的河床,包括河道拓宽和凝结,然后河床退化。在施工的上游,在砾石护堤加固处,有堤岸侵蚀的记录。参考部分保持相对不变。通过记录通道响应自然和人为变量而获得的知识,对于参与公路建设项目的管理人员和工程师而言非常有用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号