...
首页> 外文期刊>Canadian Journal of Fisheries and Aquatic Sciences >Compensation ratios needed to offset timing effects of losses and gains and achieve no net loss of productive capacity of fish habitat
【24h】

Compensation ratios needed to offset timing effects of losses and gains and achieve no net loss of productive capacity of fish habitat

机译:需要补偿比率,以抵消损失和收益的时间影响,并使鱼类生境的生产能力不发生净损失

获取原文
获取原文并翻译 | 示例
           

摘要

Minns' (Can. J. Fish. Aquat. Sci. 54: 2463-2473 (1997)) framework for assessing net change of productive capacity of fish habitats in Canada is expanded to include the effect of timing of losses and gains on cumulative net change. The expansion requires establishment of a reference time frame for assessment. A time frame of twice the project's duration is recommended. Delaying compensation actions while incurring losses early in a project increases the levels of compensation required. The addition offuture discounting had much less effect on compensation requirements than the effects resulting from timing differences between losses and compensation. As discounts apply equally to losses and gains, they likely balance out over time. Delays between when habitat alterations occur and when expected productive capacity is attained increase the required compensation. There are advantages to starting compensation efforts early in a development project, A case study of a hypothetical northern diamond mineshows how various components of compensation (replacement, uncertainty, and timing) can be integrated when assessing net change. Consideration of all components of compensation indicates the need for tougher precautionary compensation guidelines with ratios greater than the current 1:1. Values of 2:1 or higher may be necessary to ensure attainment of Canada's guiding policy principle of no net loss.
机译:Minns's(Can。J. Fish。Aquat。Sci。54:2463-2473(1997))框架用于评估加拿大鱼类栖息地生产能力净变化的框架已扩展到包括损失时间和收益时间对累积净值的影响更改。扩大需要确定一个评估的参考时间框架。建议的时间范围是项目工期的两倍。在项目早期导致损失的同时延迟赔偿行动会增加所需赔偿的水平。未来贴现对补偿要求的影响要比损失和补偿之间的时间差异所产生的影响要小得多。由于折扣同样适用于损失和收益,因此它们可能会随着时间的推移而平衡。在生境改变发生与达到预期生产能力之间的延迟增加了所需的补偿。在开发项目中尽早开始补偿工作有很多好处。假设的北部钻石矿的案例研究表明,在评估净变化时如何整合补偿的各个组成部分(置换,不确定性和时机)。考虑到补偿的所有组成部分,表明需要更严格的预防性补偿准则,其比率应大于当前的1:1。为确保达到加拿大的无净亏损指导政策原则,可能需要使用2:1或更高的值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号