首页> 外文期刊>Canadian Journal of Civil Engineering >Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory
【24h】

Risk identification and assessment for engineering procurement construction management projects using fuzzy set theory

机译:基于模糊集理论的工程采购建设管理项目风险识别与评估

获取原文
获取原文并翻译 | 示例
           

摘要

Considerable work has been carried out on risk qualitative and quantitative assessment but far less on risk identification. This paper introduces a newly developed method for risk identification, based on micro risk breakdown structure and newly introduced identification procedure called preventive root cause and effective remedial. It also introduces a risk responsibility matrix that distributes the responsibilities associated with each risk among project stakeholders and introduces a newly developed method for qualitative and quantitative assessment of each item using fuzzy set and fuzzy probability theories. Output of the proposed assessment method is pre-mitigation contingency of each risk which represents a quantitative indicator for decision making whether to mitigate or not the risk being considered. Two case studies and one numerical example are presented to demonstrate the applicability and illustrate the essential features of proposed identification, allocation, and assessment methods.
机译:在风险定性和定量评估方面已进行了大量工作,但在风险识别方面却开展的工作少得多。本文介绍了一种新的风险识别方法,该方法基于微观风险分解结构和新引入的识别程序,称为预防根本原因和有效补救措施。它还引入了一个风险责任矩阵,在项目利益相关者之间分配了与每种风险相关的责任,并介绍了一种新开发的方法,该方法使用模糊集和模糊概率理论对每个项目进行定性和定量评估。所提出的评估方法的输出是每种风险的缓解前的意外情况,它表示决策是否减轻风险的定量指标。提出了两个案例研究和一个数值示例,以证明其适用性并说明所提出的识别,分配和评估方法的基本特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号