...
首页> 外文期刊>Engineering Geology >Ground movements over longwall workings in the Kamptee coalfield, India
【24h】

Ground movements over longwall workings in the Kamptee coalfield, India

机译:印度坎佩特煤田长壁开采的地面运动

获取原文
获取原文并翻译 | 示例
           

摘要

Subsidence investigations were conducted over three superimposed longwall panels in the Kamptee coalfield of Central India. The extracted contiguous seams were lying below a water bearing unconfined aquifer. Filling of voids with sand hydraulically was practised to avoid a sudden inrush of water into the under-ground workings through ground-movement induced cracks. The non-effective width of extraction varied between 0.55 and 0.61 times the thickness of intact rockmass in the overburden. The maximum subsidence, slope, compressive and tensile strains were 9 percent of extraction thickness, 6.1, 6.6 and 5.3 rum m~(-1), respectively. The angle of draw was influenced by the presence of a fault and composition of superincumbent strata. The ground movements lowered water table by 6.5 m in the unconfined aquifer due to the mining.
机译:在印度中部的坎普特煤田,对三个叠加的长壁板进行了沉降调查。提取的连续接缝位于含水不限水层的下方。为了避免水由于地面运动引起的裂缝而突然涌入地下作业中,采用液压方式用沙子填充空隙。开采无效宽度在覆盖层完整岩体厚度的0.55到0.61倍之间变化。最大下沉,斜率,压缩应变和拉伸应变分别占抽出厚度的9%,分别为6.1、6.6和5.3 rum m〜(-1)。拉拔角度受断层的存在和上伏地层组成的影响。由于开采,地面运动使无限制含水层的地下水位降低了6.5 m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号