...
首页> 外文期刊>Engineering Geology >Large scale buffer material test: Mock-up experiment at CIEMAT
【24h】

Large scale buffer material test: Mock-up experiment at CIEMAT

机译:大规模缓冲材料测试:CIEMAT的模拟实验

获取原文
获取原文并翻译 | 示例
           

摘要

FEBEX is a demonstration and research project, which is being carried out by an international consortium led by the Spanish agency ENRESA and simulates components of the engineering barrier system in accordance with the ENRESA's AGP (Deep Geological Disposal) Granite reference disposal concept. The project includes tests on three scales: an "in situ" test at full scale in natural conditions; a "mock-up" test at almost full scale in controlled conditions: and a series of laboratory test to complement the information from the two large-scale test. The components of the mock-up test are similar to those of the "in situ" test: two electric heaters, a clay barrier consisting of highly compacted bentonite blocks, instrumentation, automatic control of heaters, and a data acquisition system for the data generated. The heterogeneities of the natural system (granite formation) are avoided, the hydration process is controlled with unlimited amount of water at constant pressure, and the boundary conditions are better defined than in the "in situ" test. The operational phase -hydration and heating- started in February 1997. It was initially planned to last for three years, but it has been decided to extend the operational phase to get as close as possible complete saturation of the buffer. Fifty-five months after the start of the operational phase, it can be concluded that the synergy achieved from the simultaneous. Integrated performance of tests at different scales, is a valuable approach to establishing the viability of the reference concept, and making progress in the understanding and evaluation of the behaviour in the near field, especially the clay barrier.
机译:FEBEX是一个演示和研究项目,由西班牙机构ENRESA牵头的国际财团进行,并根据ENRESA的AGP(深部地质处置)花岗岩参考处置概念模拟工程屏障系统的组成部分。该项目包括三个方面的测试:自然条件下的全面“原位”测试;在受控条件下几乎完全进行“模拟”测试:以及一系列实验室测试以补充两次大规模测试中的信息。模拟测试的组件与“原位”测试的组件相似:两个电加热器,由高度压实的膨润土块组成的粘土屏障,仪器,加热器的自动控制以及用于生成数据的数据采集系统。避免了自然系统的不均匀性(花岗岩的形成),在恒压下用无限量的水控制水合过程,并且比“原位”测试更好地定义了边界条件。水化和加热操作阶段于1997年2月开始。最初计划持续三年,但已决定延长操作阶段,以使缓冲区尽可能接近完全饱和。运营阶段开始后的55个月,可以得出结论,同时实现了协同作用。在不同规模下进行综合测试是建立参考概念可行性的一种有价值的方法,并且可以在理解和评估近场(尤其是粘土屏障)行为方面取得进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号