...
首页> 外文期刊>Irrigation and Power Journal >TRIAL OPERATION OF CHUKHA UNIT AS SYNCHRONOUS MOTOR
【24h】

TRIAL OPERATION OF CHUKHA UNIT AS SYNCHRONOUS MOTOR

机译:作为同步电动机的楚科单元的试运转

获取原文
获取原文并翻译 | 示例
           

摘要

Eastern regional system with its high voltage network, due to large gap between peak and off-peak load, has been experiencing over voltage particularly during lean hours of operation. Besides other usual methods of controlling overvoltage an attempt was made to run Chukha Hydro Power Station unit(s) in motoring mode with an idea to conserve water also. Results of certain on-line tests for the security of the system as a whole have been found to be encouraging, Depending on further clearance from commercial angle regular operation is contemplated during lean hours except for the months with high-hydro conditions round-the-clock.
机译:由于高峰和非高峰负载之间的巨大差距,东部地区的高压网络系统一直在经历过电压,特别是在稀薄的运行时间。除了其他通常的控制过电压的方法外,还尝试以电动模式运行Chukha水力发电站机组,其目的也是为了节约用水。已发现某些对系统整体安全性的在线测试结果令人鼓舞。根据进一步从商业角度出发的考虑,可以考虑在稀薄小时内进行常规操作,除非在高水压条件下的月份数周不时钟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号