...
首页> 外文期刊>International Journal of Applied Mathematics & Statistics >Optimizing Safety Stock in Cement Industry when the Demand during Lead-time Distributed Generalized Gamma four-parameters
【24h】

Optimizing Safety Stock in Cement Industry when the Demand during Lead-time Distributed Generalized Gamma four-parameters

机译:提前期分布式广义Gamma四参数需求时优化水泥行业安全库存

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, probability distribution of demand during lead-time which is generalized Gamma four-parameters is considered in finding the optimal safety stock placement in cement manufacturing. The probability distribution of demand during lead-time is determined when the demand and the lead-time are probabilistic; each one is subject to different probability distribution function. The safety stock depends on the safety factor under certain service level and the standard deviation of demand during lead-time which can be obtained from the distribution. Finally, the quantities of the safety stock represent an optimal value at each position to avoid over or under stock which is the most controversial questions in the inventory system area.
机译:在寻找水泥生产中的最佳安全库存位置时,考虑了提前期需求的概率分布(广义Gamma四参数)。当需求和提前期是概率时,确定提前期需求的概率分布。每个人都有不同的概率分布函数。安全库存取决于一定服务水平下的安全系数和交货期间需求的标准偏差(可从分配中获得)。最后,安全库存的数量代表每个位置的最佳值,以避免库存过剩或不足,而这是库存系统区域中最有争议的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号