...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >A strategy for improving water recovery in kimberlitic diamond mines
【24h】

A strategy for improving water recovery in kimberlitic diamond mines

机译:改善金伯里矿钻石矿井水回收的策略

获取原文
获取原文并翻译 | 示例
           

摘要

Drought conditions and the possible lack of sufficient raw water supply are a constant reminder to the Southern African diamond miner of the need to minimize raw (new) water input while maintaining or expanding mine throughput Since water input volume is directly related to water output (loss) volume, mainly to the tailings, it is obviously beneficial to dewater the tailings as much as possible. However, this may not always be as easily achieved as first thought. Owing to the unique mineralogy of each kimberlite deposit and the unique chemical profile of each raw water source, dewatering of the slurry is not a standard process that can be applied equally across the entire diamond industry. This paper presents a first-step strategy that kimberlite diamond mine operators should consider and apply to meet and exceed their water-saving targets.
机译:干旱条件和可能的缺乏原料供水是南非钻石矿工的不断提醒,需要尽量减少原料(新)水输入,同时保持或扩大矿井产量,因为水投入量与水输出直接相关(损失 )体积,主要是尾矿,尽可能多地对尾矿脱落。 然而,这可能并不总是尽可能容易地实现。 由于每个金伯拉特矿床的独特矿物学和每个原水源的独特化学曲线,浆料的脱水不是标准过程,可以在整个钻石行业中平均应用。 本文介绍了金伯利石钻石矿井运营商应考虑并申请以满足并超出节水目标的第一步策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号