Optimization of the cycle time to increase productivity at Ruashi Mining

机译:优化循环时间,以提高瑞秋矿业生产率

获取原文
获取原文并翻译 | 示例
           

摘要

The optimization of the cycle time to increase productivity at Ruashi Mining was an on-site project investigation conducted from December 2017 to January 2018. The main objective of the investigation was to determine the actual cycle time components. These comprise the queuing time, loading time, hauling time, and dumping time of ADTs (articulated dump trucks). Data was also collected on two hydraulic shovels to identify where these could be optimized. The actual cycle time obtained was compared to the theoretical cycle time to ascertain the constraints, which affect productivity. By applying Systems Thinking to the cycle time, man-made constraints of the actual cycle time were identified and recommendations to mitigate them suggested to optimize the cycle time. However, rainfall is a natural constraint that adversely affects the actual cycle time, and which cannot be mitigated. In addition, both the theoretical and actual cycle time were analysed, as well as the theoretical and actual productivity for the year 2017. Based on the findings, conclusions and recommendations were made to optimize the cycle time.
机译:在瑞秋矿业生产率提高循环时间的优化是2017年12月至2018年1月进行的现场项目调查。调查的主要目标是确定实际的周期时间组件。这些包括排队时间,加载时间,牵引时间和倾倒的ADTS(铰接式自卸卡车)。数据也被收集在两个液压铲上,以确定这些可以优化的位置。获得的实际循环时间与理论周期时间进行比较,以确定影响生产率的约束。通过应用思考循环时间的系统,确定了实际周期时间的人为约束,并建议减轻他们建议优化循环时间。然而,降雨是一种自然约束,对实际循环时间产生不利影响,并且不能减少。此外,分析了理论和实际周期时间,以及2017年的理论和实际生产力。根据调查结果,结论和建议进行了优化循环时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号