...
首页> 外文期刊>Petroleum Technology Quarterly >Claus waste heat boiler economics Part 2: mechanical considerations: The design of a cost effective waste heat boiler faces many,often opposing factors affecting the performance and reliability of the exchanger
【24h】

Claus waste heat boiler economics Part 2: mechanical considerations: The design of a cost effective waste heat boiler faces many,often opposing factors affecting the performance and reliability of the exchanger

机译:克劳斯废热锅炉经济学部件2:机械考虑:一种成本效益的废热锅炉的设计面临许多,通常相反的因素影响交换器的性能和可靠性

获取原文
获取原文并翻译 | 示例
           

摘要

The Claus waste heat boiler(WHB)runs under quite harsh operating conditions,has serious reliability challenges,and is one of the most fragile equipment items in the sulphur recovery unit(SRU).It not only provides heat recovery from the thermal section,but it also affects the unit's hydrogen balance and COS levels through recombination reactions.
机译:克劳斯废热锅炉(WHB)在相当苛刻的操作条件下运行,具有严重的可靠性挑战,是硫磺回收单元(SRU)中最脆弱的设备项目之一。它不仅提供了从热部分提供热量回收,而且 它还通过重组反应影响单位的氢气平衡和COS水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号