Engineering-geological, geotechnical and hydrogeological parameters of the Soroska tunnel rock sequences

机译:Soroska隧道岩序列的工程 - 地质,岩土工程和水文地质参数

获取原文
获取原文并翻译 | 示例
           

摘要

The detailed stage of engineering-geological and hydrogeological survey for the motorway R2 Rozria-va - Jablonov nad Turfiou assessed engineering-geological, geotechnical and hydrogeological conditions along the SoroSka tunnel route. The roles of the geological survey consisted of the verification of geology, partitioning and characteristics of the rock massif. The tunnel tubes were divided into quasihomogeneous blocks, carried out together with categorization of the rock mass in the RMR (Rock Mass Rating) and QTS (Classification of rock and semi-rock formations for underground constructions) classification systems. Geological survey has contributed to the geological knowledge by the finding that the Szin Beds manifest meta-morphic overprint typical for Turaaicum, as well as strong tectonic overprint. Over the Szin Beds in the length 1.725-2.3 km of the tunnel route (from the western portal) the bed of Gutenstein limestones/dolomites of Silicicum was north-vergently tectonically displaced. Moreover, the Szin Beds along the Soroska tunnel route are tectoni-cally reduced along an E-W to ESE-WNW trending fault zone with steep dip to N, displacing the Szin Beds with Gutenstein limestones/dolomites in their tectonic overlier on the Steinalm and Wetterstein limestone massif, as well as smaller body of Reifling/pseudoreifling limestones, all belonging to Silicicum. Results of communication tracking tests showed common direction of the groundwater currents in karstic-fissure environment towards the Evetes groundwater source and the Hrusovska jaskyna cave at the Hrusov village, as well as connections of the tunnel section with the springs in the Krasnohorska Dlha Luka area.
机译:高速公路R2 Rozria-Va的工程 - 地质和水文地质调查的详细阶段 - Jablonov Nad Turfiou评估了沿Soroska隧道途径的工程 - 地质,岩土性和水文地质条件。地质调查的角色包括岩石地质,分区和特征的验证。将隧道管分成醌型块,与RMR(岩石质量额定值)和QTS中的岩体分类一起进行(地下结构的岩石和半岩层的分类)分类系统。地质调查有助于发现Szin床表现为Turaaicum的典型典型的地质知识,以及强大的构造叠印。在隧道路线(来自西门户网站)的隧道路线的长度为1.725-2.3公里的床床上,古氏岛石灰石/白云岩的床北部是北方 - 冥想的偏移。此外,沿着Soroska隧道途径的Szin床沿着EWS-WNW趋势的故障区减少,陡峭的浸给N,将Szin床与Gutenstein Limestones / Dolomites移位在Steinalm和Wettersein石灰石上Massif,以及Reifling / Pseudeifling石灰岩的较小的身体,都属于硅质。通信跟踪试验结果表明,在Hrusov村的evetes地下水源和Hrusovska Jaskyna洞穴中的岩溶 - 裂缝环境中的地下水漏洞以及隧道段的连接,以及在Krasnohorska dlha Luka地区的春天的连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号