首页> 外文期刊>Journal of Petroleum Technology >Kuwait Case Study: Integrated-Reservoir-Management Approach Offsets Effects of Reservoir Heterogeneity, Injectivity Challenges, and Delayed Waterflood
【24h】

Kuwait Case Study: Integrated-Reservoir-Management Approach Offsets Effects of Reservoir Heterogeneity, Injectivity Challenges, and Delayed Waterflood

机译:科威特案例研究:综合储层管理方法抵消了储层非均质性,注入性挑战和延迟注水的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The Upper Burgan is a muitilayered reservoir in the Sabiriyah field of northern Kuwait, currently undergoing the initial phase of waterflood development. The reservoir is highly complex with respect to reservoir heterogeneity, connectivity, and structural compartmentalization. Early waterflood performance was too poor to achieve the targeted injection rates. Detailed channel mapping enhanced the subsurface understanding to add value to the ongoing drilling, production, and injection plans. The inte-grated-reservoir-management (IRM) approach, with a strategy for depletion and pressure support for each segment, increased short-term production and is sustaining the rates. The current and short-term drilling plans target reservoir segments with higher pressures for well placement.
机译:布尔根上层是科威特北部萨比里耶油田的多层储层,目前正处于注水开发的初期阶段。就储层的非均质性,连通性和结构分区而言,储层高度复杂。早期注水性能太差,无法达到目标注入速度。详细的通道映射可增强对地下的了解,从而为正在进行的钻井,生产和注入计划增加价值。集成储层管理(IRM)方法,为每个段提供了枯竭和压力支持的策略,增加了短期产量并维持了产量。当前和短期钻探计划的目标是将较高压力的油藏段用于油井布置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号