...
首页> 外文期刊>Journal of advanced nursing >Task uncertainty and communication during nursing shift handovers
【24h】

Task uncertainty and communication during nursing shift handovers

机译:护理班次移交过程中的任务不确定性和沟通

获取原文
获取原文并翻译 | 示例
           

摘要

Aims. We explore variations in handover duration and communication in nursing units. We hypothesize that duration per patient is higher in units facing high task uncertainty. We expect both topics and functions of communication to vary depending on task uncertainty. Background. Handovers are changing in modern healthcare organizations, where standardized procedures are increasingly advocated for efficiency and reliability reasons. However, redesign of handover should take environmental contingencies of different clinical unit types into account. An important contingency in institutions is task uncertainty, which may affect how communicative routines like handover are accomplished. Method. Nurse unit managers of 80 care units in 18 hospitals were interviewed in 2008 about topics and functions of handover communication and duration in their unit. Interviews were content-analysed. Clinical units were classified into a theory-based typology (unit type) that gradually increases on task uncertainty. Quantitative analyses were performed. Findings. Unit type affected resource allocation. Unit types facing higher uncertainty had higher handover duration per patient. As expected, unit type also affected communication content. Clinical units facing higher uncertainty discussed fewer topics, discussing treatment and care and organization of work less frequently. Finally, unit type affected functions of handover: sharing emotions was less often mentioned in unit types facing higher uncertainty. Conclusion. Task uncertainty and its relationship with functions and topics of handover should be taken into account during the design of handover procedures.
机译:目的我们探讨了护理部门中移交时间和沟通的差异。我们假设面对任务不确定性较高的单位,每位患者的病程较长。我们期望交流的主题和功能会根据任务的不确定性而变化。背景。在现代医疗机构中,移交正在发生变化,出于效率和可靠性的原因,越来越多地倡导标准化程序。但是,移交的重新设计应考虑到不同临床单元类型的环境突发事件。机构中的一个重要意外事件是任务不确定性,这可能会影响诸如交接之类的沟通例程的完成方式。方法。 2008年,对18家医院的80个护理单位的护士单位经理进行了访谈,主题涉及其交接沟通的主题和功能以及所在单位的持续时间。访谈内容进行了分析。临床单位被分类为基于理论的类型学(单位类型),随着任务的不确定性逐渐增加。进行定量分析。发现。单元类型影响资源分配。面临更高不确定性的单位类型每位患者的移交时间更长。不出所料,单元类型也会影响通信内容。面临更高不确定性的临床部门讨论的话题更少,讨论的治疗和护理以及工作安排的频率降低。最后,单元类型影响切换功能:在面临更高不确定性的单元类型中,共享情感的提及较少。结论。在设计移交程序时,应考虑任务不确定性及其与移交功能和主题的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号