...
首页> 外文期刊>Journal of Advanced Computatioanl Intelligence and Intelligent Informatics >Priority Rule-Based Construction Procedure Combined with Genetic Algorithm for Flexible Job-Shop Scheduling Problem
【24h】

Priority Rule-Based Construction Procedure Combined with Genetic Algorithm for Flexible Job-Shop Scheduling Problem

机译:结合遗传算法的基于优先级规则的施工程序求解柔性作业车间调度问题

获取原文
获取原文并翻译 | 示例
           

摘要

The heuristic method we propose solves the flexible job-shop scheduling problem (FJSP) using a solution construction procedure with priority rules. FJSP is more complex than classical scheduling problems in that operations are processed on one of multiple candidate machines, one of which must be selected to get a feasible solution. The solution construction procedure with priority rules is implemented on top of the efficient existing method for solving the FJSP which consists of a genetic algorithm and a local search method. The performance of the proposed method is analyzed using various benchmark problems and it is confirmed that our proposed method outperforms the existing method on problems with particular conditions. The conditions are further investigated by applying the proposed method on newly created benchmark.
机译:我们提出的启发式方法使用具有优先级规则的解决方案构造过程解决了柔性作业车间调度问题(FJSP)。 FJSP比传统的调度问题更复杂,因为操作是在多个候选机器之一上处理的,必须选择其中一个以获得可行的解决方案。在具有遗传算法和局部搜索方法的FJSP高效求解方法的基础上,实现了具有优先级规则的求解构造过程。通过各种基准测试问题分析了该方法的性能,证实了该方法在特定条件下的性能优于现有方法。通过在新创建的基准上应用建议的方法进一步研究条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号