...
首页> 外文期刊>Pollution Equipment News >Environmental Demands Met with New Regenerative Activated Coke Technology
【24h】

Environmental Demands Met with New Regenerative Activated Coke Technology

机译:新型再生活性炭技术满足环保要求

获取原文
获取原文并翻译 | 示例
           

摘要

Utility and industrial sources face complex issues with the prospects of placing additional control equipment in the plant to meet increasingly stringent standards. In addition to the global issues of climate change and prospective CO_2 control, and to local and regional issues of water use and waste disposal, the remand of CAIR and CAMR in 2008 resulted in less regulatory certainty at the federal level, and independent action by the states for establishing environmental permit levels for mercury and criteria pollutants.
机译:公用事业和工业资源面临着复杂的问题,它们有望在工厂中放置更多的控制设备以满足日益严格的标准。除了全球气候变化和可能的CO_2控制问题,以及局部和区域的用水和废物处理问题外,2008年CAIR和CAMR的还款还降低了联邦一级的监管确定性,并且联邦政府采取了独立行动建立汞和标准污染物环境许可水平的州。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号