首页> 外文期刊>Physics of atomic nuclei >Comparison between the measured and calculated reactivity in measuring the effectiveness of the emergency protection at the stage of physical start-up of unit no. 3 at the Kalinin nuclear power plant
【24h】

Comparison between the measured and calculated reactivity in measuring the effectiveness of the emergency protection at the stage of physical start-up of unit no. 3 at the Kalinin nuclear power plant

机译:在编号为5的物理启动阶段,在测量应急保护有效性时所测得的反应性与计算出的反应性之间的比较。加里宁核电站3

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents comparisons between the effectiveness of the emergency protection under both stationary and nonstationary formulations calculated with the use of the RADUGA-7. 5 package [1] and experimental data obtained in measuring the "weight" of the emergency protection in the process of physical start-up of the VVER-1000 reactor of unit no. 3 of the Kalinin NPP. On the basis of the results obtained, recommendations are given on comparing the measured and calculated reactivity and parameters determined by using its value.
机译:本文介绍了使用RADUGA-7计算的固定式和非固定式紧急保护措施的有效性之间的比较。 5包[1]以及在编号1的VVER-1000反应堆物理启动过程中测量应急保护“重量”时获得的实验数据。加里宁核电厂的3。根据获得的结果,给出比较测量和计算的反应性以及使用其值确定的参数的建议。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号