Drill and Blast (D&B) and Tunnel Boring Machine (TBM) are the two dominating excavation methods in hard rock tunnelling. Selection of the cost effective excavation method for a tunnel is a function of tunnel cross section area, rock conditions, tunnel length, availability of skilled labour and proper equipment, and project schedule. Over the past few decades, major technological development and technical advances have been achieved in both methods. Yet, in many tunnelling projects, choosing the excavation method is still a challenge and requires considering pros and cons of each method and estimating construction time, costs, as well as post construction and operation & maintenance, and related risk in the planning phase. In this study, the productivity and efficiency of the D&B and TBM options for excavating certain size tunnels have been examined. The analysis is based on recent NTNU prediction models for advance rate and unit excavation cost for given ground conditions and tunnel geometry. For excavation of large size tunnels in very hard rock, the D&B method seems to be the cost effective choice irrespective to tunnel geometry. This is compared to smaller long tunnels with good boreability were the TBM has higher advance rate. The tunnel size and rock conditions have higher impact on the TBM performance and costs than for D&B. This refers to lower risk of using D&B where the use of this method is otherwise justified. (C) 2016 Elsevier Ltd. All rights reserved.
机译:钻爆(D&B)和隧道钻孔机(TBM)是硬岩隧道中的两种主要开挖方法。选择具有成本效益的隧道开挖方法取决于隧道横截面积,岩石条件,隧道长度,熟练工人和适当设备的可用性以及项目进度。在过去的几十年中,两种方法都取得了重大的技术发展和技术进步。然而,在许多隧道项目中,选择开挖方法仍然是一个挑战,需要考虑每种方法的利弊,并在规划阶段估算施工时间,成本以及后期施工,运营和维护以及相关风险。在这项研究中,已经研究了D&B和TBM选项用于开挖某些尺寸隧道的生产率和效率。该分析基于最近的NTNU预测模型,用于在给定的地面条件和隧道几何条件下的超前速度和单位开挖成本。对于在非常坚硬的岩石中开挖大型隧道,无论隧道几何形状如何,D&B方法似乎都是一种经济有效的选择。与此相比,TBM具有较高的推进率,因此具有更好的可钻性的较小的长隧道。与D&B相比,隧道尺寸和岩石条件对TBM性能和成本的影响更大。这是指使用D&B的风险较低,而在其他情况下使用此方法是合理的。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号