首页>
外国专利>
TBM BACKFILL GROUTING CONDITION EVALUATION METHOD OF SHIELD TBM TUNNEL SEGMENT AND BACKFILL GROUTING CONDITION EVALUATION DEVICE
TBM BACKFILL GROUTING CONDITION EVALUATION METHOD OF SHIELD TBM TUNNEL SEGMENT AND BACKFILL GROUTING CONDITION EVALUATION DEVICE
展开▼
机译:盾构TBM隧道段的TBM回填注浆条件评价方法及回填注浆条件评价装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method for evaluating a filling state of a backfill material of a shield TBM tunnel segment and a device for evaluating the filling state of the backfill material using the same. According to an embodiment of the present invention, the method for evaluating the filling state of the backfill material of the shield TBM tunnel segment comprises: a step of performing an impact echo test for each of a ′segment filled with the backfill material′ and a ′segment not filled with the backfill material′, and collecting the item-specific data of the backfill material filling state determination standard repeatedly for a predetermined number of times; a step of deriving a backfill material filling state determination standard through a statistical analysis on the collected item-specific data; and a step of determining a target segment state according to the derived backfill material state determination standard.
展开▼