首页> 外文期刊>Tunnelling and underground space technology >Mechanical responses of existing tunnel due to new tunnelling below without clearance
【24h】

Mechanical responses of existing tunnel due to new tunnelling below without clearance

机译:由于下面没有间隙的新隧道,现有隧道的机械响应

获取原文
获取原文并翻译 | 示例
           

摘要

With the development of urban subway, there are more projects of new subway construction below existing subway. The project is more challenging if the new subway is excavated below the existing subway with no pillar in between. In this research, we propose an analytical solution to investigate the mechanical responses of the existing tunnel due to new tunnel construction below without clearance. We put forward a superposition method based on the Winkler model to simulate the absence of the springs under the existing tunnel at the intersection of the new and existing tunnel. The proposed solution is successfully validated by FEM simulation. The influences of the input parameters of the model, including the range of deleted springs, the coefficient of subgrade reaction, and the equivalent bending stiffness, on the deflection and the bending moment of the existing tunnel, are studied. The research can serve as a reference to ensure both the safety and the serviceability of existing tunnels in case of new tunnelling below existing tunnel without clearance.
机译:随着城市地铁的发展,在现有地铁之下还有更多的新地铁建设项目。如果将新地铁开挖到现有地铁下方且中间没有支柱,则该项目更具挑战性。在这项研究中,我们提出了一种分析解决方案,以研究由于下面没有间隙而新建的隧道导致的现有隧道的机械响应。我们提出了一种基于Winkler模型的叠加方法,以模拟在新旧隧道相交处的现有隧道下没有弹簧的情况。所提出的解决方案已通过有限元仿真成功验证。研究了模型输入参数(包括删除的弹簧范围,路基反作用系数和等效弯曲刚度)对现有隧道的挠度和弯矩的影响。该研究可为确保现有隧道下方没有通行的新隧道情况下确保现有隧道的安全性和可服务性提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号