...
首页> 外文期刊>Tunnelling and underground space technology >Ground settlement induced by tunneling crossing interface of water-bearing mixed ground: A lesson from Changsha, China
【24h】

Ground settlement induced by tunneling crossing interface of water-bearing mixed ground: A lesson from Changsha, China

机译:含水混合地面隧道穿越界面引起的地面沉降-来自中国长沙的一个教训

获取原文
获取原文并翻译 | 示例
           

摘要

Tunneling in mixed ground faces great challenges in control of shield machine, and improper operation easily trigger hazards without warning. Recently, an unexpected ground surface settlement of approximately 0.05 m was observed in the mixed ground of Changsha, China. When the shield machine advanced from the low-permeability ground to the high-permeability ground, the lag in the regulation of chamber pressure allowed the water inflow from the excavation face, hydraulic pressure loss at the tunnel face thus induced large settlement. To further investigate ground responses induced by tunneling crossing the interface of water-bearing mixed ground, a 3D fluid-solid coupling finite element model is established in this study. The results indicate obvious drawdown of the groundwater occurs when the shield machine crosses the interface of low-permeability and high-permeability ground with low chamber pressure, leading to significant ground consolidation settlement with close to the measured results. Three typical settlement development modes that are related to the relative position of the monitoring section to the interface are proposed to describe the tunneling-induced settlement in the water-bearing mixed ground. The experience of this case history provides an important lesson for the future control of shield tunneling in the water-bearing mixed ground.
机译:在混合地面中进行隧道施工时,盾构机的控制面临巨大挑战,操作不当很容易在没有警告的情况下引发危险。最近,在中国长沙的混合地面中观察到了约0.05 m的意外地面沉降。当盾构机从低渗透率地面向高渗透率地面前进时,调节腔室压力的滞后使水从开挖面流入,隧道面的液压损失因此引起大的沉降。为了进一步研究隧道穿越含水混合地面界面引起的地面响应,本研究建立了一个3D流固耦合有限元模型。结果表明,当盾构机以低室压穿过低渗透性和高渗透性地面的界面时,会出现明显的地下水渗入,导致显着的地面固结沉降,接近测量结果。提出了三种与监测段相对于界面的相对位置有关的典型沉降发展模式,以描述含水混合土层中隧道引起的沉降。该案例的经验为将来在含水混合地面中盾构的控制提供了重要的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号