Using direct normal irradiance models and utility electrical loading to assess benefit of a concentrating solar power plant

机译:使用直接的正常辐照度模型和公用电力负荷来评估集中式太阳能发电厂的效益

获取原文
获取原文并翻译 | 示例
           

摘要

The objective of this paper was to determine if three different direct normal irradiance (DNI) models were sufficiently accurate to determine if concentrating solar power (CSP) plants could meet the utility electrical load. DNI data were measured at three different laboratories in the United States and compared with DNI calculated by three DNI models. In addition, utility electrical loading data were obtained for all three locations. The DNI models evaluated were: the Direct Insolation Simulation Code (DISC), DIRINT, and DIRINDEX. On an annual solar insolation (e.g. kW h/m~2) basis, the accuracy of the DNI models at all three locations was within: 7% (DISC), 5% (DIRINT), and 3% (DIRINDEX). During the three highest electrical loading months at the three locations, the monthly accuracy varied from: 0% to 16% (DISC), 0% to 9% (DIRINT), and 0% to 8% (DIRINDEX). At one location different pyranometers were used to measure GHI, and the most expensive pyranometers did not improve the DNI model monthly accuracy. In lieu of actually measuring DNI, using the DIRINT model was felt to be sufficient for assessing whether to build a CSP plant at one location, but use of either the DIRINT or DIRINDEX models was felt to be marginal for the other two locations due to errors in modeling DNI for utility peak electrical loading days - especially for partly cloudy days.
机译:本文的目的是确定三种不同的直接法向辐照度(DNI)模型是否足够准确,以确定聚光太阳能(CSP)电厂是否可以满足公用电力负荷。在美国三个不同的实验室测量了DNI数据,并将其与通过三个DNI模型计算出的DNI进行了比较。此外,还获得了所有三个位置的公用电力负荷数据。评估的DNI模型是:直接日晒模拟代码(DISC),DIRINT和DIRINDEX。以每年的日照量(例如kW h / m〜2)为基础,所有三个位置的DNI模型的准确性均在7%(DISC),5%(DIRINT)和3%(DIRINDEX)之内。在三个位置的三个最高电气负载月份中,每月精度变化范围为:0%至16%(DISC),0%至9%(DIRINT)和0%至8%(DIRINDEX)。在一个位置,使用了不同的总辐射表测量GHI,而最昂贵的总辐射表并未提高DNI模型的每月精度。代替实际测量DNI,使用DIRINT模型被认为足以评估是否在一个位置建立CSP工厂,但是由于错误,对于其他两个位置,使用DIRINT或DIRINDEX模型被认为是边缘性的。在为公用事业高峰用电天数(特别是部分阴天)建模DNI时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号