...
首页> 外文期刊>Solar Energy >Modified Perturb and Observe (P&O) with checking algorithm under various solar irradiation
【24h】

Modified Perturb and Observe (P&O) with checking algorithm under various solar irradiation

机译:在各种太阳辐射下具有检查算法的改进的扰动和观测(P&O)

获取原文
获取原文并翻译 | 示例
           

摘要

This paper proposes a modified maximum power point tracking (MPPT) technique for photovoltaic (PV) system using an improved Perturb and Observe (P&O) with a checking algorithm. The main advantage of this method is its simplicity and accuracy of the algorithm such that it can even be computed accurately using a low cost microcontroller. The basic idea of this modified P&O is adding a checking algorithm into a modified MO MPPT. This checking algorithm functions to determine the global maximum power by comparing all existed peak points first, before the modified P&O algorithm takes place to identify the voltage at MPP (V-MPP), which is needed to calculate the duty cycle for the boost converter. A simulation using MATLAB/Simulink under partial shading condition has been done to test the effectiveness of the algorithm. The simulation results are satisfactory and show that the improved technique is able to track the PV maximum power during partial shading condition with 100% of tracking efficiency and produce zero ripple at the load side. (C) 2017 Elsevier Ltd. All rights reserved.
机译:本文提出了一种改进的用于光伏(PV)系统的最大功率点跟踪(MPPT)技术,该技术采用了带有检查算法的改进的Perturb and Observ(P&O)。该方法的主要优点是算法的简单性和准确性,因此甚至可以使用低成本微控制器精确计算出该方法。修改后的P&O的基本思想是将检查算法添加到修改后的MO MPPT中。该检查算法的功能是通过先比较所有存在的峰值来确定全局最大功率,然后再进行修改的P&O算法以识别MPP(V-MPP)电压,这是计算升压转换器的占空比所必需的。使用MATLAB / Simulink在部分阴影条件下进行了仿真,以测试该算法的有效性。仿真结果令人满意,表明改进的技术能够在部分阴影条件下以100%的跟踪效率跟踪PV最大功率,并在负载侧产生零纹波。 (C)2017 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号