...
【24h】

Shuohuang Railway

机译:s火黃railway

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

About 200km south of the Daqin Line lies another heavy-haul operation - the 590km Shuohuang Railway. This double-track electrified line, which links Shenchi in the west of Shanxi province with Huanghua Port, has also witnessed a sharp increase in coal traffic since it opened in May 2000, and is now trying to increase capacity.rnThe line carried 134.8 million gross tonnes last year, well in excess of its design capacity. According to Shuohuang Railway's president, Mr Xue Jilian, by 2008 it had carried an accumulated total of 660 million gross tonnes, generating operating revenues of Yuan 42.26 billion ($US 6.2 billion) and a net profit of Yuan 13.56 billion.
机译:大秦线以南约200公里处还有另一条重载业务-590公里的朔黄铁路。自2000年5月通车以来,这条双线电气化线路将山西省西部的神池与黄hua港连接起来,煤炭运输量也急剧增加,目前正试图增加运力。rn该线路载重1.348亿欧元去年的产量超过了设计能力。硕煌铁路公司总裁薛继联表示,到2008年,该公司累计运送了6.6亿总吨,实现营业收入422.6亿元人民币(62亿美元),实现净利润135.6亿元人民币。

著录项

  • 来源
    《International railway journal》 |2009年第8期|25-25|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号