Research on Subcontractor Risk of EPC Hydropower Project in Vietnam

机译:越南EPC水电项目分包商风险研究

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects. ? The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity. ? In order to overcome above, the current study attempt s ?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam. ? Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam ; ?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups . ?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks. ? Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.
机译:工程,采购和建筑(EPC)合同正成为在大型水电项目上进行建筑工程的最受欢迎形式。 ?越南EPC总承包商在水电项目的建设阶段遇到了许多困难,导致进度严重延迟和成本超支。原因之一是分包商的能力差。 ?为了克服上述问题,本研究试图对越南EPC水电项目延误过程的识别与控制分包商进行研究。 ?通过总结越南EPC水电项目以往研究的国际研究成果,结合越南EPC水电项目建设发展的特点,指出了越南EPC水电项目延期过程的各种分包商风险。设计了包含18个风险要素的问卷,然后分发给EPC水电项目管理领域的专家。根据风险模型,确定了11个主要风险要素,可以将其分为3组。最后,当前的研究提出了减少或避免风险的建议以及控制风险的方法。 ?此外,这项研究的结果对于在与越南有着相似经济和投资环境的其他国家工作的项目管理团队,可以按期完成EPC建设项目提供了很好的管理参考,从而确保了对政府的收益,投资者,承包商和有关各方。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号