以青芝寺高架桥为例,详细地介绍了高架桥侧移桩柱承载力计算分析过程,以了解结构现在状态下的内力分布情况,并通过桩柱在发生侧向位移后的计算结果得出其极限承载能力不能满足规范要求的结论.%The artide introduced the process of the calculation and the analysis of the bearing capacity in the viaduct lateral piles by the back-ground of the Qingzhisi viaduct. So as to know distribution of inner force present situation. Through the calculation results of the piles lateral displament the article reached the result of that its maximum load-bearing capacity can not meet the regulatory requirements.
展开▼