Taking the erection construction of the main cable of Balinghe Bridge as the example,the paper explores the erection methods for the main cable of the suspension bridge,introduces the horizontal releasing cable craft of the suspension bridge,the wired reciprocating traction system,the total entry of saddles,and adjustment cable craft,so as to lay the experience for the erection construction of main cable of similar suspension bridges.%以坝陵河大桥主缆架设工程为例,探讨了悬索桥主缆架设方法,分别介绍了悬索桥水平放索工艺,单线往复式牵引系统,整形入鞍工艺及调索工艺,为今后同类悬索桥主缆架设施工积累了一定经验。
展开▼