Based on a variety of survey and testing methods used by survey field of production line technological transformation engineering of Ul- tra thin strip and field soil test, this paper accurately grasped the engineering geological condition of survey site, reasonably determined the karst soil geotechnical parameters and demonstrated the treatment scheme and foundation program of karst and collapse soil hole, produced good econo- my benefit, had certain reference significance to similar karst soil engineering investigation of survey site.%通过对唐钢超薄带钢生产线技术改造工程勘察场地采用多种勘察方法与测试手段及现场土工试验,准确掌握了勘察场地的工程地质条件,合理确定岩土技术参数并论证岩溶和塌陷土洞的处理方案和地基基础方案,产生了良好的经济效益,对类似勘察场地的岩土工程勘察具有一定的借鉴意义。
展开▼