To begin with the engineering practice, the paper introduces the bored pile construction methods of compaction workshop of Lanhua fertilizer plant, and briefly describes the quality control methods in construction process. The pile foundation detection results show that: the field pile foundation construction meets the design requirements.%从工程实际出发,介绍了兰花化肥厂压缩厂房灌注桩施工方法,简要阐述了施工过程中的质量控制方法,桩基检测结果表明:该场地桩基施工满足设计要求。
展开▼