首页> 外文会议>GeoHunan international conference >Research on the Construction of Ultra-long Bored Cast-in-situ Piles in Lake Region
【24h】

Research on the Construction of Ultra-long Bored Cast-in-situ Piles in Lake Region

机译:湖区超长钻孔灌注桩施工研究

获取原文

摘要

Collapse may easily happen during the hole-drilling of the ultra-long bored cast-in-situ piles, which influences the pile-hole making, the quality of underwater concrete, the drilling speed as well as the construction cost. On account of Pier A's foundation of the Maocaojie Bridge, the paper deals with the construction methods for smooth boring, pile-hole collapse prevention and quality guarantee of concrete placement, on condition of the complicated geological environment. By virtue of the force analysis of the hole wall and the Mohr-Coulomb failure criteria, the research proposes the concept of the minimum depth for the pile hole and illustrates the accuracy of this concept, which may supports similar construction.
机译:超长钻孔灌注桩的钻孔过程中很容易发生塌方,这会影响桩孔的制作,水下混凝土的质量,钻孔速度以及施工成本。鉴于茅草街大桥A墩的基础,在复杂的地质环境条件下,探讨了畅通无阻的钻孔施工方法,桩孔塌方的预防及混凝土浇筑质量的保证方法。通过对孔壁的力分析和Mohr-Coulomb破坏准则,该研究提出了桩孔最小深度的概念,并说明了此概念的准确性,这可能会支持类似的构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号