The paper analyzes the pipe jacking construction examples of the tunnel projects for transmission lines,and points out some measures to ensure the pipe jacking construction quality according to the features of the project from the system and breakdown process engineering two aspects thinking,so as to have certain direction significance for the similar projects.%结合输电线路隧道工程顶管施工实例进行分析,根据工程特点从体系制度和分项工序工程两个方面思考,提出了保障顶管施工质量的若干措施,对同类工程具有一定指导意义。
展开▼