结合青岛海湾大桥现浇连续箱梁施工,针对用不同支架组合进行连续箱梁施工时,箱梁线形在施工过程中的控制过程及方法做了详细介绍,以期使箱梁成品线形达到设计目标。%Combining with the construction of cast-in-situ continuous box girder of Qingdao Haiwan Bridge, this thesis specifically introduces the control process and methods in the construction process of box girder linear with different support combination, so as to achieve the design target of box girder linear.
展开▼